Drywalling continues over in Balsam house, with taping and priming mostly complete on the lower floors. The walls for the top floor in Cameron house have now been poured, and coming up next will be final glazing and roof installation.

Exterior siding is now complete on the southernmost block of townhomes, along with most of the interior insulation. The northernmost block of townhomes is nearing completion of exterior insulation, and framing for the central block has reached the second floor.